Register now to gain access to all of our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, post status updates, manage your profile and so much more. If you already have an account, login here - otherwise create an account for free today!
Photo

Islamabad: Lehtrar Road

* * - - - 1 votes Lehtrar Road Park Road Islamabad Highway Simly Dam Taramari Chowk Zone 4 MAAKSONS

  • Please log in to reply
21 replies to this topic

#1
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,366 posts
  • Gender:Male
  • Location:Lahore - Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
Designed by: N/A
Status: Completed / Getting Dual Tracked
Contractors: MAAKSONS
Infrastructure Type: Avenue
Construction Date: N/A
Completion Date: N/A
Location: From Islamabad Highway, through Park Road, P.I.N.S.T.E.C.H., Simly Dam and then forks out towards Rawalakot (Azad Kashmir) and Occupied Kashmir.

Render: N/A
Description: N/A
Site Plan: N/A
Website: N/A

'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on Face Book here and refer us for any job!


#2
RANA AAA

RANA AAA

    Deputy Chief Minister

  • Senior Members
  • PipPipPipPipPipPipPipPip
  • 1,788 posts
  • Gender:Male
  • Location:Sydney, Australia
Latherer Road expansion in doldrums

Online

ISLAMABAD: The project to convert Latherer Road into two lanes is in doldrums, as the development work could not be started since long on the project. According to sources, under the Phase-II, Rs. 400 million would be spent to make the road two lanes and tenders were sought for the project in April and the lowest bid was 18 percent high as compare to the estimated cost and former Chairman Kamran Lashari postponed it. Although, the contract of Zero Point Interchange was awarded 69 percent high as compare to the estimated cost, sources added. Officials told that after canceling of tenders, pre-qualification of Construction Firms were sought again and the applications were scrutinized but tenders were not sought as the file was put in cold storage.

#3
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
well i can update it till the park road crossing but actually it goes till PINSTECH, Nilore, Islamabad.

Expect updates after eid, but there is a small chance that i shall upload them before coming Sunday.

#4
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
Here are the fresh updates prepared today:-

DECEMBER 2008


Posted Image
A view of Taramari Chowk, the ending of Park road with Lethrar Road.

Posted Image
Taramari Chowk, notice the new asphalt which was actually the leftover from the carpeting material of Park Road.

Posted Image
A view of the Lethrar Road from Taramari Chowk.

Posted Image
Another view of the road.

Posted Image
Another one....

Edited by Umair Ahmed, 08 May 2010 - 02:21 AM.
Links Fixed!


#5
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
Posted Image
The newly built bridge-1 for the new track.

Posted Image
The old bridge for the old track in comparison with the new one.

Posted Image
The old bridge (considered dangerous).

Posted Image
The new bridge-2.

Edited by Umair Ahmed, 08 May 2010 - 02:27 AM.
Links Fixed!


#6
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
Posted Image
Again a comparison of the new bridge-2 and its adjacent old brother.

Posted Image
The state of the old bridge-2.

Posted Image
Another showing the plight of the commuters. They reduce their speeds to crawl here to avoid any damage to their vehicles.
The fractures are so deep!

Posted Image
A view of the market at Khanna Pul Interchange.

Posted Image
The crossing just before Khanna Bridge. Observe the worst state of an important crossing. that can be imagined!

Edited by Umair Ahmed, 08 May 2010 - 02:31 AM.
Links Fixed!


#7
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
Posted Image
Another view of the congested crossing with no traffic signals resulting in extreme weaving of traffic from all 4 directions.


Posted Image
A view showing the slip road to Islamabad Expressway at the bottom and the road to Khanna Bridge going higher.



That's all then.

Edited by Umair Ahmed, 08 May 2010 - 02:33 AM.
Links Fixed!


#8
RANA AAA

RANA AAA

    Deputy Chief Minister

  • Senior Members
  • PipPipPipPipPipPipPipPip
  • 1,788 posts
  • Gender:Male
  • Location:Sydney, Australia
why the pics wid the link to urbanpk gallery are not working

#9
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,366 posts
  • Gender:Male
  • Location:Lahore - Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!

All set to launch construction work

Thursday, July 16, 2009
Mobarik A. Virk

Islamabad

All is set to launch physical work on the 8-kilometre 3-lane Lehtrar dual carriageway linking Taramari Chowk, located at the eastern end of the ‘Garden Avenue’ with Pinstech.

Capital Development Authority (CDA) Chairman Imtiaz Inayat Elahi, late Tuesday afternoon, paid a visit to the base camp established by the contractors, M/s MAKSONS, engaged by the authority for execution of work on the project.

The chairman, who also had a tour of the existing road from ‘Khanna Bridge’ on the Islamabad Expressway to Pinstech, directed the contractors as well as the officials from the concerned directorates of the authority to take special care to preserve the trees along the road on both sides of the upcoming Lehtrar dual carriageway.

“Once completed this dual carriageway would provide better road access to the people of adjoining areas and an alternate route for the people of Kashmir, especially to Bagh and Rawalakot as well,” the chairman said.

The Rs735 million project, work on which started from June 15 this year, but is yet to be formally inaugurated by a dignitary, most likely Prime Minister Syed Yusuf Raza Gilani, is scheduled to be completed within 18 months by December 14, 2010.

The 8-km each side, two-lane project with a shoulder of 3.65-meter width, which would be of the same specifications as of the road itself, will have two bridges and a median of variable width up to 24 feet running in between.

The Director-General (Works) of the CDA, Abdul Jabbar Melano, when contacted told ‘The News’ that the total length of the project will be 16-km, 8-km each side. “Over eight thousands vehicles pass through the existing road daily and once this dual carriageway would be completed people of the area as well as those travelling on this part of the road would certainly feel a lot relieved,” he said.

The sources in the CDA told ‘The News’ that there were a few constraints that the project was confronted as some graves and mosques, coming in the project may be required to be shifted/relocated while the work on relocation of services and utilities would also be something that would require a lot of attention to prevent any hiccup in execution of work on this project.


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on Face Book here and refer us for any job!


#10
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,366 posts
  • Gender:Male
  • Location:Lahore - Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
Umair, any updates on this now?

'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on Face Book here and refer us for any job!


#11
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
Semester Break - Not in Islamabad But in curfew induced Peshawar... in October i'll cover it.

If a camp of Maksons can be deployed safely and extensively it will be near Taramari Chowk.

But Lethrar road is already 2 lane on each side don't get the 16km new extension they are talking about. The track from taramari chowk to khanna is a new one and flawless while the other is great as far as the road goes but the bridges are in dilapidated condition, they were declared dangerous when the new track was being made but then the signs were removed.

But then again it doesn't comply with the 16km they are talking about... anyhow the news says 3-lane at first, then it says 2-lane, please clarify.

#12
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
Updated the first post!

Man this road goes to Rawalakot and Occupied Kashmir!

The second track has started being worked upon by MAAKSONS. They got the track cleared, straightened, paved with the base overnight!
Pics coming today...

#13
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
OCTOBER 2009


Road from Taramari Chowk

Posted Image

Posted Image

Posted Image

#14
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,366 posts
  • Gender:Male
  • Location:Lahore - Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
Ground Breaking Ceremony OCT 2009

Posted Image

Posted Image

Posted Image

'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on Face Book here and refer us for any job!


#15
Umair Ahmed

Umair Ahmed

    Tehsil Nazim

  • Members
  • PipPipPipPipPip
  • 380 posts
  • Gender:Male
  • Location:Peshawar - Islamabad
  • Interests:Tourism, photography, researching new techs in electronics industry, FPGAs & PCBs, programming, Hangin out with Friends (mostly on my own money, kanjoos log!).
The second track has been ready with asphalt laid for a few days now... They are making the adjoining rain drains along the side of both tracks.

#16
aliee

aliee

    Naib Tehsil Nazim

  • Members
  • PipPipPipPip
  • 227 posts
very informative you got all info from all over the Pakistan wow

#17
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,366 posts
  • Gender:Male
  • Location:Lahore - Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!

ZPI, Lehtrar Road and Park Enclave Project inaugurated
eProperty | Islamabad Real Estate | July 6, 2011

Park Enclave project a must to make capital role model, says PM

ISLAMABAD: Prime Minister Yousuf Raza Gilani inaugurated Zero Point Interchange (ZPI), Dualisation of Lehtrar Road and residential project Park Enclave on Tuesday.

Addressing the ceremony, Gilani said though Park Enclave Islamabad seem like a residential project was for the elite class, it was necessary because Islamabad was the federal capital and it should be a role model for the people and investors who come from outside the country. He said but still societies for the middle class would be constructed.

There was a problem of water in the federal capital due to which a committee has been formed and it has been convincing all provinces to give water for the federal capital, he said.

While talking to journalists Gilani said government was very keen to solve the problem and shortage of CNG.

CDA Chairman Imtiaz Inayat Elahi said it was matter of honor for him that after 22 years CDA had launched a residential sector. Due to international importance of the city there should be model infrastructure. CDA had been continuously constructing overhead bridges, under passes and flyovers, he added. He said during construction of ZPI trees were shifted to other places. Changes in design saved 200 trees, he said, adding, 10 lops out of 11 had been completed.

He said Lehtrar road was also very important. Every day 12,000 vehicles passed from that road. As road had been completed so residents of Lehtrar, Nilore, Ali Pur Farash, Kahota and other areas will be facilitated.

Regarding Park Enclave he said Park Enclave would be environment friendly and gated colony. In those residential building facilities of community care buildings, parks, lakes, open-air restaurant, walking tracks, LED street lights and other facilities would be provided.


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on Face Book here and refer us for any job!


#18
Usman

Usman

    Naib Union Nazim

  • Members
  • PipPip
  • 12 posts
kindly you have any update about master plan for zone 4 ... ?? or any  plan for cda for zone 4 kindly reply


kindly tell me about farash town islamabad plan

#19
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,366 posts
  • Gender:Male
  • Location:Lahore - Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
 

kindly tell me about farash town islamabad plan

 
What exactly do you want to know about the Farash Town. Specify please.

'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on Face Book here and refer us for any job!


#20
Usman

Usman

    Naib Union Nazim

  • Members
  • PipPip
  • 12 posts
plan for future road linking towards bharakhoo

kindly tell me also about d pros and cros of transfer of plot in farash town and 
some people says that construction in farash town is banned by honorable SCP.