Register now to gain access to all of our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, post status updates, manage your profile and so much more. If you already have an account, login here - otherwise create an account for free today!
Photo

Tarbela: Tarbela HEP Dam & Lake

* * * - - 1 votes

  • Please log in to reply
3 replies to this topic

#1
Waqar

Waqar

    Chief Minister

  • Community Team
  • 3,265 posts
  • Gender:Male
Designed by: None
Status: Completed
Contractors: None
Infrastructure Type: Lake/Water Reservoir
Construction Date: 1968
Completion Date: 1974
Construction Cost: USD 1,497 Million [1]
Client: Tarbela Joint Venture
Dam Lenght: 2,743.2 metres (9,000 ft) km
Dam Height: 143.26 metres (470 ft) from river level
Area: N/A Acres
Location: Tarbela, Swabi, Khyber Pakhtunkhwa

Render: None

Description:

Tarbela Dam (Urdu: تربیلا بند) is a large dam on the Indus River in Pakistan. It is located in Swabi[2] in Khyber pakhtunkhwa, about 50 kilometres (31 mi) northwest of Islamabad. The dam is 485 feet (148 m) high above the riverbed. The dam forms the Tarbela Reservoir, with a surface area of approximately 250-square-kilometre (97 sq mi). The dam was completed in 1974 and was designed to store water from the Indus River for irrigation, flood control, and the generation of hydroelectric power.

Description

The project is located at a narrow spot in the Indus River valley,at tarbela in haripur in hazara division, where the river formerly split around a large island close to the left bank. The main dam wall, built of earth and rock fill, stretches 2,743 metres (8,999 ft) from the island to river right, standing 148 metres (486 ft) high. A pair of concrete auxiliary dams spans the river from the island to river left. The spillways, located on the auxiliary dams, in turn consist of two parts. The main spillway has a discharge capacity of 18,406 cubic metres per second (650,000 cu ft/s) and the auxiliary spillway, 24,070 cubic metres per second (850,000 cu ft/s). The outlet works are a group of four tunnels that have been cut through the valley wall at river right, for uses of hydropower generation and flow control. These tunnels were originally used to divert the Indus River while the dam was being constructed. The fifth river outlet is situated on the left side of the dam and was completed in April 1976.People from Hazara division living across river Indus gave sacrifices and left their lands and homes for the sake of dam construction.These people are now settled by govenment of Pakistan in Khala Butt Township Haripur, Pakistan.

A hydroelectric power plant on the right side of the main dam houses 14 generators fed with water from outlet tunnels 1, 2, and 3. There are four 175MW generators on tunnel 1, six 175MW generators on tunnel 2, and four 432MW generators on tunnel 3, for a total generating capacity of 3,478 MW. Tarbela Reservoir is 80.5 kilometres (50.0 mi) long, with a surface area of 250 square kilometres (97 sq mi). The reservoir holds 11,600,000 acre feet (1.43×1010 m3) of water, with a live storage of 9,700,000 acre feet (1.196×1010 m3). The catchment area upriver of the Tarbela Dam is spread over 168,000 square kilometres (65,000 sq mi) of land largely supplemented by snow and glacier melt from the southern slopes of the Himalayas. There are two main Indus River tributaries upstream of the Tarbela Dam. These are the Shyok River, joining near Skardu, and the Siran River near Tarbela.
[edit] Main dam

The principal element of the project is an embankment 9,000 feet (2743 meters) long with a maximum height of 465 feet (143 meters). The total volume of earth and rock used for the project is approximately 200 million cubic yards (152.8 million cu. meters) which makes it the largest man made structure in the world , except for the Great Chinese Wall which consumed somewhat more material.[citation needed] The main embankment is a carefully designed, zoned structure composed of impervious core, bounded on both sides by gradually increasing sized material including coarser sands gravels cobbles and finally large sized riprap on the outer slopes. An impervious blanket, 42 feet (12.8 meters) thick at the dam and tailing to 5 feet (1.52 meters) at the upstream end, covers 5,700 feet (1737 meters) of the alluvial foundation on the upstream side. These deposits in the valley are up to 700 feet (213 meters) deep and in places consist of open work gravels. The dam crosses this essentially alluvial valley and connects the last points to high ground before the mountains give way to the plains. A 24 feet (7.32 meters) thick filter drain mattress under the embankment together with nearly vertical chimney drain provides the necessary facility to collect the seepage.[3]

Power Station

According to the original plan, four (4) power units of 175 MW generating capacity each were to be installed on each of the tunnels 1, 2 and 3 located on the right bank with the ultimate installed capacity of 2,100 MW. Of these, four (4) units on tunnel 1 were commissioned in the year 1977. Due to increasing prices of the fossil fuel, the Govt of Pakistan has been laying greater emphasis on generation of cheap Hydro power. In pursuance of this policy, WAPDA carried out studies to tap the maximum power potential of Tarbela. As a result, it has been found possible to install six (6) units, instead of four (4) only on tunnel NO.2. Units 5 to 8 on tunnel NO.2 were commissioned in 1982, and units 9 and 10 in 1985. Based on studies, four power units of 432 MW capacity each were installed on tunnel NO.3. Thus the total ultimate power potential of the project enhanced from 2100 MW as originally planned to 3478 MW. There are further plans to increase the power generation by 800 MW to bring the total Power Generation Capacity to more than 4200 MW.

Project Implementation

On May 14, 1968, the World’s largest single contract for the construction of civil works at that time, the Tarbela Dam Project was signed at a price of RS.2,965,493,217 ($ 623 Million) between the Water and Power Development Authority of Pakistan and the Tarbela Dam Joint Venture which comprised a group of three Italian and three French heavy construction contractors. Later five German and two Swiss contractors also joined the group making up a consortium of thirteen European firms led by Italian firm namely Impregilo. The engineers for the design and supervision of construction and operation were from the firm Tippetts, Abbett, McCarthy and Stratton International Corporation (TAMS) of the United States.

The construction of Tarbela Dam was carried out in three stages to meet the diversion requirements of the river. In stage-I, the river Indus was allowed to flow in its natural channel while work was continued on right bank where a 1500 feet (457 meters) long and 694 feet (212 meters) wide diversion channel was excavated and a 105 feet (32 meters) high buttress dam was constructed with its top elevation at 1, 187 feet (362 meters) The diversion channel was capable of discharging 750,000 cusecs (21,238 cumecs). Construction under stage-I lasted 2½ years.

In stage-II, the main embankment dam and the upstream blanket were constructed across the main valley of the river Indus while water remained diverted through the diversion channel. By the end of stage-II, tunnels, had been built for diversion purposes. The stage-II construction took 3 years to complete. Under stage-III, the work was carried out on the closure of diversion channel and construction of the dam in that portion while the river was made to flow through diversion tunnels. The remaining portion of upstream blanket and the main dam at higher levels was also completed as a part of stage-III world.

The reservoir created submerged much of Amb state.

Life Span

Because the source of the Indus River is glacial meltwater from the Himalayas, the river carries huge amounts of sediment. The annual suspended sediment load is about 430 million tons per year. This means that, over time, the reservoir will fill. The useful life of the dam and reservoir was estimated to be somewhere around fifty years, since the dam's completion in 1976, meaning that the reservoir would have been full of sediment by 2030.

Sedimentation, however, has been much lower than predicted, and it is now estimated that the useful lifespan of the dam will be 85 years, to about 2060.

Source: Wikipedia

Site Plan: N/A
Google Image: N/A
Website: None

Posted Image

#2
Waqar

Waqar

    Chief Minister

  • Community Team
  • 3,265 posts
  • Gender:Male
Posted Image

Posted Image

#3
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,642 posts
  • Gender:Male
  • Location:Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!

Dams incurring continuous rise in water level

Monday, 24 May, 2010

KARACHI: Pakistan’s major reservoirs, Mangalla and Terbella, are experiencing a continuous rise in their water levels, according to a report on Monday.

According to the Met office, water is flowing in the reservoirs on a continuous basis.

In Mangalla dam, the usable water deposits have become 1,707,000 acre/feet. The dam’s water level has surpassed the dead level of 1,040 feet as the level has further risen by two feet.

Moreover, Terbella dam is now 15 feet and six inches above the dead level of 1,378 feet and six inches, reaching the level of 1,393 feet.

The overall water inflows have been recorded as 68,304 cusec whereas the outflows as 38,000cusec. — DawnNews


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on here and refer us for any design work!


#4
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 14,642 posts
  • Gender:Male
  • Location:Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!


Diamer Bhasha Dam, Gwadar port in quake-prone zone
Two top projects of the country – the gigantic but yet-to-be-built Diamer Bhasha Dam and the strategic Gwadar port – are vulnerable and face a high risk of destruction as both are in the earthquake-prone zone.
“We should not construct dams upstream of Tarbela Dam in Zone-4 where earthquake of a high magnitude of 9 can strike,” Geological Survey of Pakistan Chief Dr Imran Ahmed Khan suggested during a briefing to the Senate Standing Committee on Petroleum and Natural Resources, which met here on Tuesday under the chairmanship of Senator Muhammad Yousaf.
He said some areas of Islamabad and Karachi also fell in Zone-4 where earthquake of a high magnitude could hit, adding the whole area of Gwadar port was also in this zone. The Singhar Housing Scheme of Gwadar was also covered by Zone-4.
“We have submitted reports about the possibility of an earthquake to all relevant agencies,” he said.
dr-imran-ahmed-khan.jpg?w=625
“In future, an earthquake with a magnitude of 9 may rock Zone-4 where Tarbela Dam has been built and another big reservoir over the dam will also be affected by the disaster,” he said, adding construction of water reservoirs like Diamer Bhasha Dam in the area could result in a damaging incident, similar to the Attabad lake case.
Khan claimed that no agency had ever contacted the Geological Survey of Pakistan to seek clearance before planning any project. His department had sent several reports to different agencies about environmental hazards, but he said no action had been taken.
He, however, failed to respond when committee members asked how India was building dams in held Kashmir if Bhasha Dam was in an earthquake-prone zone.
Panel members recalled that the construction of Diamer Bhasha Dam got delayed as donors were reluctant to provide funds and stressed that Pakistan was facing an energy crisis and the government should build small dams.
“After the 18th Constitution Amendment, provinces have been allowed to construct small dams and they should work on them to tackle the energy crisis,” a panel member suggested.
Khan revealed that Kabul River had rick and rock content and people of Khyber-Pakhtunkhwa living along the river had been suffering from cancer and other diseases because of drinking its water from generation to generation.
“We have noticed that 83% of children are born with deformity in the area of Akora Khattak due to consumption of water from Kabul River,” he said and added some cases of deformity were also found in Punjab.
Briefing about Reko Diq gold and copper mine in Balochistan, Khan told the committee the mine held reserves of trillions of dollars and said Swat also had world’s most precious gemstones in its mines.


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on here and refer us for any design work!





0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users