Jump to content

Welcome to .::UrbanPK::.
Register now to gain access to all of our features. Once registered and logged in, you will be able to create topics, post replies to existing threads, give reputation to your fellow members, get your own private messenger, post status updates, manage your profile and so much more. If you already have an account, login here - otherwise create an account for free today!

  • Please log in to reply
141 replies to this topic

#1
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 16,534 posts
  • Gender:Male
  • Location:Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
Designed by: Ar. Yawar Gillani [ARCOP Associates Pvt. Ltd.]
Status: Under Construction
Developers: A & A Associates
Contractors: Associated Constructors Limited (ACL)
Project Manager: Adnan Asdar & Associates
Building Type: Commercial
Height: 492 ft
Floors Above Ground: 28
Floors Under Ground: N/A
Office Floors: 17
Parking Floors: 9
Location: Centre Point (Trakker Tower) Near DHA Phase 7 Extension, KPT Interchange, Karachi

Karachi%20-%20Trakker%20Tower%20-%20Goog

Render:

Karachi%20-%20Trakker%20Tower%20-%20Rend

New Renders

Karachi%20-%20Trakker%20Tower%20-%20Rend

Karachi%20-%20Trakker%20Tower%20-%20Rend

Karachi%20-%20Trakker%20Tower%20-%20Rend

Karachi%20-%20Trakker%20Tower%20-%20Rend


Description:

Building
The Building comprises 3,57,720 sq. ft. of commercial space standing at a height of 492 feet including the communication tower. With its high end facilities and a total of Ground + 27 floors, the followingbreak-up has been implemented:
  • The first 9 floors are 'Parking Floors' which accomodate 237cars and 200 motorcycles, maintaining a ratio of 1 car park per 682 sq ft. and 1 motorcycle per 800 sq ft. There is also designated Executive Car Parking on the ground floor for 27 cars.
  • There is an Exclusive Parking Floor for CEOs and COOs,.
  • Exclusive Parking Floor for Visitors,
  • Exclusive Parking Floor for Motorcycles,
  • The next 2 floors will be used for mechanical services,
  • Offices will be on 17 floors (11 th - 27th) of which there are;


  • 11 floors of 12,100 sq. ft.(approx.), each
  • 1 floor of 11,000 sq. ft (approx.)
  • 3 floors of 4,000 sq. ft. (approx.), each
  • 2 interconnected Penthouse floors with an area of 5,150 sq.ft. (approx.).

  • A Rooftop Swimming Pool, Restaurant and Outdoor facilities are available on the 24th Floor.
  • There are High Speed and reliable elevators ensuring constant circulation
Standards
Aesthetics and sensibility have both been maintained, with high-quality and low maintenance finishing throughout the environmentally friendly building.
  • The Building is designed by a leading architectural firm of international repute, in complete adherence to the relevant international and local building and safety codes.
  • There is ample provision of Natural Light, Natural Ventilation, Green Areas and Smoker Terraces for a pollution free environment.
  • Internationally rated Life, Fire safety and Seismic codes are a standard practice throughout the building.
  • Plumbing lines of high quality Polyvinyl Chloride (UPVC) and water supply pipes of Polypropylene Random (PPR) are available on all floors
  • Trakker Group plans to house its own offices in Centrepoint, thus ensuring the prospective buyers of the quality of construction and subsequent maintenance services of the highest standards.
Additional Facilities
  • Water saving plumbing fixtures.
  • days water storage capacity
  • swimming pool having changing rooms/shower areas, lounging decks and a recreational space.
  • A Health club
  • An 80 Foot atrium/reception
  • International restaurants.
  • Outdoor Terraces for events and private functions on the 24th floor
  • The building is designed in a way that if required, each floor may be bifurcated into two separate wings with an impressive front entrance lobby and services from the rear
  • Valet services are available for the additional convenience of VIP visitors.
  • Each office floor entitles parking spaces for 11 cars and 11 motorcycles
Safety and Security
  • Security has also been given importance and all entry points have controlled access, with a state-of-the-art centralized system developed with the help of foreign consultants.
  • Auto Gates (RFID Tags) and Road Blockers are available with centralized logging.
  • Digital Entrance Locksets are also standard.
  • Closed Circuit Cameras and 24/7 Video Screening are constantly in operation.
  • Emergency lights at strategic locations are installed
  • Two Fire hose cabinets on each floor, with Fire Extinguishers in case of emergency.
  • A Sprinkler system is available even on parking floors, meeting all the relevant international safety standards.
  • A Fire detection system has been installed in compliance with NFPA 72 (National Fire Alarm Code).
  • All ducts have automatic fire dampers.
  • Automatic elevator recall and voice evacuation systems are available.
  • Two Fire Escape Staircases (Front & Rear) exist for evacuation purposes.
  • The latest Integrated Building Management Systems (BMS) have been installed.
Site Plan: N/A
Floor Plan: N/A
Model:

Karachi%20-%20Trakker%20Tower%20-%20Mode

Website:

Centre Point
ACL

Cost: Rs.1025 Million
Construction Date: N/A
Completion Date: 2008

Courtesy: *PK Revolution* for NEW Renders!

Edited by Tekno Arkitect, 21 April 2014 - 11:46 PM.
Info Updated

fb513ed61e7e4dd39b9dc2d859be413f.gifi.gif?e=eyJhdiI6MjMwMzcsImF0Ijo0LCJjbSI6
 


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on here and refer us for any design work!


#2
Waqas

Waqas

    Union Nazim

  • Members
  • PipPipPip
  • 85 posts
  • Location:Lahore
I like the design, its very unique and has alot of details.

#3
SwerveUT

SwerveUT

    Union Nazim

  • Members
  • PipPipPip
  • 50 posts
Where is this located?

#4
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 16,534 posts
  • Gender:Male
  • Location:Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
location not specified in the website release!

fb513ed61e7e4dd39b9dc2d859be413f.gifi.gif?e=eyJhdiI6MjMwMzcsImF0Ijo0LCJjbSI6
 


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on here and refer us for any design work!


#5
JADI

JADI

    Union Nazim

  • Members
  • PipPipPip
  • 81 posts
Here are more details on Trakker tower from http://www.smehboob.com

Trakker Tower, Karachi
Architects : Arcop Associates


Currently stated to be Karachi’s tallest building at 35 floors, this 325,000 sft building is a purpose built high end office tower. Facilities include an ‘Energy Centre’ with 100% power generation and cogeneration.


Posted Image

#6
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 16,534 posts
  • Gender:Male
  • Location:Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
A much better view now than the model itself.

fb513ed61e7e4dd39b9dc2d859be413f.gifi.gif?e=eyJhdiI6MjMwMzcsImF0Ijo0LCJjbSI6
 


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on here and refer us for any design work!


#7
*PK Revolution*

*PK Revolution*

    PK ReVoLuTioN

  • Members
  • PipPipPipPipPip
  • 598 posts
  • Gender:Male
  • Location:Karachi
  • Interests:Construction, Music, internet, Blogging, Social Networking, Cricket, Table Tennis, Movies, Gaming
:thumbup: Lookin awesome!!! Nice work JADI!! Certainly now its clearly visible!!
Proud to be a PAKISTANI
Posted Image
Visit Karachi *The City Of Lights*

Geo Musharraf
Always remember "Pakistan comes first"

"My Salute goes to each and every Law enforcement personnel who laid down their lives in saving ours from enemies of Pakistan"

#8
Guest_monaimpk90_*

Guest_monaimpk90_*
  • Guests
i hope it get builds!
cuz it doesnt seems to it will get build!
hope INSHALLAH IT GETS BUILD!
plz can some one post the pics of the construction site!

#9
*PK Revolution*

*PK Revolution*

    PK ReVoLuTioN

  • Members
  • PipPipPipPipPip
  • 598 posts
  • Gender:Male
  • Location:Karachi
  • Interests:Construction, Music, internet, Blogging, Social Networking, Cricket, Table Tennis, Movies, Gaming
Actually rit now its not underconstruction!! It'll start in 1 or two months!! Rit now coordinates r being taken on site so as to mark the positioning of pilling!! Its located near Hino Honda showroom!! Just beside it!!N ACL has been given its contract!! The company tht is constructing Creek Vista!! It'll b finished in 2 and a half years!!
Proud to be a PAKISTANI
Posted Image
Visit Karachi *The City Of Lights*

Geo Musharraf
Always remember "Pakistan comes first"

"My Salute goes to each and every Law enforcement personnel who laid down their lives in saving ours from enemies of Pakistan"

#10
*PK Revolution*

*PK Revolution*

    PK ReVoLuTioN

  • Members
  • PipPipPipPipPip
  • 598 posts
  • Gender:Male
  • Location:Karachi
  • Interests:Construction, Music, internet, Blogging, Social Networking, Cricket, Table Tennis, Movies, Gaming
Construction wud b startn after 1 october!! Its name is Trakker Tower!! Mods plz correct it!!
Proud to be a PAKISTANI
Posted Image
Visit Karachi *The City Of Lights*

Geo Musharraf
Always remember "Pakistan comes first"

"My Salute goes to each and every Law enforcement personnel who laid down their lives in saving ours from enemies of Pakistan"

#11
*PK Revolution*

*PK Revolution*

    PK ReVoLuTioN

  • Members
  • PipPipPipPipPip
  • 598 posts
  • Gender:Male
  • Location:Karachi
  • Interests:Construction, Music, internet, Blogging, Social Networking, Cricket, Table Tennis, Movies, Gaming
Construction wud b startn after 1 october!! Its name is Trakker Tower!! Mods plz correct it!!
Proud to be a PAKISTANI
Posted Image
Visit Karachi *The City Of Lights*

Geo Musharraf
Always remember "Pakistan comes first"

"My Salute goes to each and every Law enforcement personnel who laid down their lives in saving ours from enemies of Pakistan"

#12
musiddiqui

musiddiqui

    Zila Nazim

  • Management
  • 1,677 posts
  • Gender:Male
  • Location:Karachi
Posted Image

Posted Image

#13
*PK Revolution*

*PK Revolution*

    PK ReVoLuTioN

  • Members
  • PipPipPipPipPip
  • 598 posts
  • Gender:Male
  • Location:Karachi
  • Interests:Construction, Music, internet, Blogging, Social Networking, Cricket, Table Tennis, Movies, Gaming
Gud newz is tht my brother is on ths project!! It has 29 floors above ground n it will b completed by the end of 2009!! I do know its whole schedule!! Its is a great project!! Whn u enter the building thr will b a a huge lobby! N 4m ground floor 2 about 15th floor u can see all the way through as u see above ur self 4m the lobby!! So u can just gauge 4m ths how superb it'll b!!
Proud to be a PAKISTANI
Posted Image
Visit Karachi *The City Of Lights*

Geo Musharraf
Always remember "Pakistan comes first"

"My Salute goes to each and every Law enforcement personnel who laid down their lives in saving ours from enemies of Pakistan"

#14
Tekno Arkitect

Tekno Arkitect

    Arkitect I Urbanist I Photographer I Cyclist

  • Management
  • 16,534 posts
  • Gender:Male
  • Location:Islamabad
  • Interests:Arkitechture, Photography, Bicylcing, Net Surfing!
Good to hear the project has started but I doubt it will be completed before 2010. I will take about 6months from now to work on the foundations, n then we will see some super structure (ie above ground structure). Karachiites....keep the updates rolling !!

fb513ed61e7e4dd39b9dc2d859be413f.gifi.gif?e=eyJhdiI6MjMwMzcsImF0Ijo0LCJjbSI6
 


'RANA DESIGN CONSULTANTS'
Architecture | Interiors | Landscaping | Construction Management | Professional Architectural Photography

Follow us on here and refer us for any design work!


#15
Guest_monaimpk90_*

Guest_monaimpk90_*
  • Guests
where is this project located!!!?

#16
musiddiqui

musiddiqui

    Zila Nazim

  • Management
  • 1,677 posts
  • Gender:Male
  • Location:Karachi
near the KPT Interchange on Shaheed-e-Millat Expressway will post a google earth image later

#17
shahmeer

shahmeer

    Naib Tehsil Nazim

  • Members
  • PipPipPipPip
  • 175 posts
  • Gender:Male
HI THIS THE MAP FROM THE SIDE

Attached Files



#18
musiddiqui

musiddiqui

    Zila Nazim

  • Management
  • 1,677 posts
  • Gender:Male
  • Location:Karachi
that is not the right location this tower is located behind that white rectangular building you see in the center of the image

#19
*PK Revolution*

*PK Revolution*

    PK ReVoLuTioN

  • Members
  • PipPipPipPipPip
  • 598 posts
  • Gender:Male
  • Location:Karachi
  • Interests:Construction, Music, internet, Blogging, Social Networking, Cricket, Table Tennis, Movies, Gaming
A huge billboard of Trakker tower wud soon b up near the site!
Proud to be a PAKISTANI
Posted Image
Visit Karachi *The City Of Lights*

Geo Musharraf
Always remember "Pakistan comes first"

"My Salute goes to each and every Law enforcement personnel who laid down their lives in saving ours from enemies of Pakistan"

#20
Guest_monaimpk90_*

Guest_monaimpk90_*
  • Guests
It would a great addition to the beauty of the area besides the K.P.T Interchange.





Also tagged with one or more of these keywords: ARCOP Associates Pvt. Ltd., KPT Interchange, Associated Constructors Limit, Adnan Asdar & Associates, DHAK-7E, Centre Point, Trakker Tower, High-Rise Building, A & A Associates, Corporate Building

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users